techpacks / Long products
Innovative mould oscillator for excellent caster performances BENEFITS Easy to install on existing conticasters Wider oscillation range = increased operational flexibility Improved surface quality by:…
news / TECH ADVANCES
For energy recovery in steel melting The Danieli EAF equipped with ECS system is named FASTARC 0, with clear reference to the Zero Bucket Charging process, meaning that there is no more bucket charging…
For energy recovery in steel melting Benefits: Fastarc 0 helps produce up to 12,000 – 13,000 heats per year, with a possibility of reaching 15,000 heats in the near future. FTP size is typically -35%…
news / plants startup
Only 20 months of project execution and construction and less than one month of cold commissioning The 500,000-tpy, flexible rolling mill for bars and light sections mill was started-up successfully on…
techpacks / Flat products
Innovative pinch roll design for quick roll changing BENEFITS Eliminates all unsafe procedures of conventional pinch roll changes Increased plant yield Highest safety standards and minimized manpower requirements…
news / service news
On-site machine overhauling timely executed by Danieli Service After 20 years of operation, AcerBrag called for the overhaul of the Danieli-supplied fast-finishing block overgear in operation at its wirerod…
Equipment that effectively reduces construction costs compared to traditional configuration Benefits: Reduction of civil works; the oil collection pit can be integrated in the skid base platform and the…
Less than one month from plant start-up: successful Performance Test of the 2.0 MTPY ENERGIRON Direct Reduction Plant at Ezz Steel - Egypt On 20th of December 2015, the new ENERGIRON High Productivity…
fairs / fairs
20th - 21th March 2019 | Houston, USA The US energy pipe markets have strengthened in 2018, drilling rig counts have remained at a robust level and there is optimism that 2019 will be a good year for both…
Danieli Service executed the requested intervention in less than four weeks in Saudi Arabia The scope of the Rajhi Steel project was to replace entirely the existing carbon steel cooling chamber with a…